Following an exchange of letters, the MuSé was invited by Sofico to visit the infrastructure of the E25-E40 motorway link (also known, somewhat simplistically, as the "Cointe tunnel").
We were welcomed by Patrick C, one of the site managers... "We" because the MuSé was represented by its founder, P-A Michel, and its public lighting consultant, Dominique Douette.
This kind of visit can only be organised during a night when the structures are being maintained, when traffic is prohibited.

20230921_222419.jpg

This infrastructure is impressive not only for its size, but also for its technical sophistication. Managing the traffic and any incidents that may arise requires a level of engineering that the users of these roads have no idea about.

20230921_233627.jpg
379638585_270891589108073_7161410223504081096_n b.jpg

Just for fun: three photos of the traffic-free tunnel!

379633444_848351526657446_869348614512380213_n.jpg
379633494_993147395078165_5154141083337621183_n (1).jpg
379635464_328818733139567_6837050332408530618_n.jpg

This link is packed with multiple pieces of equipment, some visible, such as signalling, others invisible, such as various sensors and detectors.

20230921_223218.jpg
381707640_776645630899597_3910497526343025732_n.jpg
379603825_1433207454203273_4609081472344548077_n.jpg

The MuSé team even enjoyed personalised demonstrations led by Patrick C. Many thanks!

These maintenance closures are also an opportunity to test different safety systems. For example, we attended the commissioning of the fire exits.